External agreements implemented in 2010

1.

Assessment of the possibility of increasing electricity production in EW Oaks as a result of the reduction of the stabiliser threshold
C2-67/2009 agreement concluded between PGE ZE Warszawa-Teren SA.
a Institute of Flow Machine PAS on 4 January 2010

2.

Energy research of the EW Stocki Mill hydroteam
C2-55/2009 agreement between ENERGY Straszyn Power Plant
Sp. z o.o. and the Institute of Flow Machines PAS

3.

Determination of the energy characteristics of hydro-devices of the Borowo Water Power Plant depending on the fall
contract C2-48/2010 concluded between IMP PAN
and ENERGA Power plants in Koszalin